Staying Organised on Site: Tips from an Apprentice
Hi, I’m Jake, an apprentice project manager at Stone Edge Construction. Construction sites can be fast-paced and complex, especially when you’re new.

Here are some tips I’ve picked up to keep things running smoothly:
Daily Notes: Keeping track of what happened each day helps me stay informed and avoid confusion.

Checklists: From safety checks to material orders, checklists keep me on track and prevent mistakes.

Speak Up Early: If I spot a problem or something unclear, I make sure to communicate it right away — it saves time and stress later.

These simple habits have made a big difference in helping me learn and support the team.

One Beverly Hills is expected to open in 2026.

All of this is set around 8-acres of breathtaking botanical gardens that will be planted at the heart of the site. The Beverly Hilton will see extensive upgrades to bring the green of the gardens into the hotel experience. With the driving philosophy of creating the healthiest and future-forward development, the new buildings and gardens of One Beverly Hills are designed to exceed California’s own ambitious sustainability goals.

“At Stone Edge Construction, we provide strategic and practical support across the entire project lifecycle.”

Using collected rainwater and recycled greywater, the extensive One Beverly Hills landscape will be 100% water sustainable. These steps will save millions of gallons of water a year. In an effort to support grid harmonization and safeguard local energy infrastructure, the project is designed with a significant centralized battery storage system, onsite photovoltaic array, and a chilled water thermal energy storage system.